Close Menu
    Salalah TimesSalalah Times
    • Automotive
    • Business
    • Entertainment
    • Health
    • Luxury
    • Lifestyle
    • News
    • Sports
    • Technology
    • Travel
    Salalah TimesSalalah Times
    Home » Bab Gas Cap to increase UAE gas processing by 20 percent by 2026
    Business

    Bab Gas Cap to increase UAE gas processing by 20 percent by 2026

    December 5, 2024
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    MENA Newswire News Desk: ADNOC Gas plc has awarded the Front-End Engineering and Design (FEED) contract for new gas processing facilities at the Bab Gas Cap (BGC) to Worley Engineering Pty Ltd. The project is set to increase ADNOC Gas’ processing capacity by 20%, or over 1.8 billion standard cubic feet per day (scfd). A Final Investment Decision (FID) is expected in 2026. The Bab Gas Cap project is integral to ADNOC’s gas growth strategy, designed to enhance production of natural gas liquids (NGL), condensate, sales gas, and sulfur.

    Adnoc Gas partners with Worley for Bab Gas Cap facility expansion

    The initiative aligns with the UAE’s objective of achieving gas self-sufficiency while reinforcing ADNOC Gas’ global market presence. Dr. Ahmed Alebri, CEO of ADNOC Gas, highlighted the project’s significance, stating, “This milestone has the potential to substantially enhance our gas processing capabilities, unlock additional revenue, and support the UAE’s energy security goals. Utilizing advanced technologies, the BGC project exemplifies ADNOC’s commitment to innovation and sustainability.”

    The design scope encompasses various gas processing facilities, including conditioning units, acid gas recovery, dehydration, sulfur recovery, NGL recovery units, and CO2 capture systems. Additionally, it includes injection facilities, utilities, and the development of pipelines to transport liquid sulfur to the Habshan Sulfur Granulation Plant.

    The facilities will process hydrocarbons from the Bab field, where advanced technologies allow simultaneous extraction of oil and gas. This innovative approach is expected to achieve daily production of 1.5 billion cubic feet of gas and 80,000 barrels of condensate, maximizing both operational and economic efficiency.

    ADNOC’s commitment to state-of-the-art technologies underscores its dedication to sustainable resource management and economic growth. By focusing on optimization and innovation, the BGC project will make a significant contribution to ADNOC’s long-term goals. This project marks a critical step in ADNOC Gas’ journey to expand operations, address rising energy demand, and maintain its reputation as a dependable global energy supplier.

    Related Posts

    Renault sets €10 billion-plus France EV investment plan

    October 5, 2026

    South Korea consumer prices rise 2.9 percent in September

    October 3, 2026

    India-US trade talks take center stage at G20 meeting

    September 30, 2026

    UAE and Zambia deepen economic ties in Abu Dhabi talks

    September 30, 2026

    Abu Dhabi named world leading improver JLL real estate index

    September 29, 2026

    UAE Minister Thani Al Zeyoudi discusses expanding global trade ties

    September 28, 2026
    Latest News

    Appendix surgery tied to lower colorectal cancer diagnoses

    October 5, 2026

    Renault sets €10 billion-plus France EV investment plan

    October 5, 2026

    Sheikh Mohamed bin Zayed hosts Senator Joni Ernst for talks

    October 3, 2026

    South Korea consumer prices rise 2.9 percent in September

    October 3, 2026

    PM Narendra Modi commends pilot Smit Machchhar for bravery

    October 3, 2026

    EU unveils EUCCS plan for secure emergency communications

    October 1, 2026

    India strengthens naval reach across key global waters

    October 1, 2026

    DR Congo Ebola toll reaches 3,901 deaths and 8,067 cases

    September 30, 2026
    © 2026 Salalah Times | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.